Our client wishes to set up a complete plant of 1200 TPD Clinker Grinding mill to produce Portland Composite Cement (PCC). Raw material will be used: Clinker: 80% Slag: 12% Limestone: 6% Gypsum: 2% The type of output cement will be 42.5 Portland Cement with fineness of 3200 ~ 3600 sq-m/kg. Dry way and closed-circuit is to be adapted for production method. The plant will be supplied under turn-key system with following scope of supply: Seller's Scope of Supply: Engineering Design and Drawings Lighting layout Design and Drawings Cable Run layout Design and Drawings Pneumatic Piping Design and Drawings Mill Inner Lay Out Drawings Raw Material (Clinker, Fly Ash, Slag and Gypsum) feeding and transportation system to mill. Cement mill, j 3.5 x 13.0 m, Central Drive Mill, Capacity; 50TPH Cement Silo System: 5000 MT for Clinker and 5000 MT for Cement Equipment of Cement Storage and transportation system Cement Packaging, Storage and Distribution System: 6 spout Rotary Packing machine Central Control System Electrical Equipments and Cables under Plant battery limit Water distribution and drainage system Compressed Air system Pipe, Valves and Fittings inside Plant Battery limit All the insulation materials. Laboratory equipment, etc Spare Parts (Mechanical and Electrical) for 1 year (list of items are to be mentioned in the offer) Supervision of Installation and Commissioning Commercial production and Training to Local operating staff Buyer's Scope of Supply: Civil design & Civil works, and facilities, equipment and materials for civil construction. Installation machinery tools and materials, water, electricity for erection. All the consuming materials for installation, such as welding rod, nails, oxygen, hydrogen, cylinder, paints, petrol, oil, grease, power line connecting material. All the illuminations of the whole plant and the connecting wires from the illuminating feeders on the distribution board to the illuminators and illuminators outside the departments. Electricity: All electrical equipment must be selected to use 11KV (all motors using 11 KV must be slip ring model) or 380 V 3 Ph 50 Hz All control voltage used should be 220 V 50 Hz Payment Term: 100% LC at sight strictly, NO down payment or TT will be made. Please send us detailed information and advise CFR Chittagong, Bangladesh price on turnkey basis along with the following information: A layout plan for the whole plant (we will supply you actual area measurements allotted for the mill once your preliminary proposal is accepted). Your customer list for Clinker Grinding mill / Cement mill machinery. Power requirement for the plant. Manpower requirement. Origin of each equipment Each component manufacturer's name is to be mentioned in the offer clearly. Delivery time. 2 sets of your hardcopy product brochures and VCD (if available) by post.