| Offer Type: |
BUY |
| Post Date: |
Feb.28,2008 |
| Expired Date: |
2008-03-05 |
| Category: |
Others |
TECHNICAL SPECIFICATIONSSUPPLY, DELIVERY, INSTALLATION, TESTING, AND COMMISSIONING OF 800KVA 380V THREE PHASE 50HZ 1500RPM STANDBY GENERATOR SET A) GENERATOR SETThe Generator Set should be of the following specification: -a) 800KVA 380V Three Phase 50Hz 1500RPM Power Supply;b) Capable of taking up load within 10s; c) Cooling system should be of standard integral set-mounted radiator system, designed and tested for rated ambient temperatures of 0oC to 50oC;d) Daily tank with automatic fuel replenishing system complete with fuel level sensor, pump, and plumbing accessories for coupling to the auxiliary tank;e) The auxiliary fuel storage tank should be of 8000 litres capacity;f) Inlet air suction hood complete with louvers;g) Control System should have GENSET system integration including automatic remote starting/stopping, precise frequency and voltage regulation, alarm and status message display, output metering, auto-shutdown at fault detection;h) Robust Steel Skid Base for supporting the engine, alternator, and radiator;i) 24V Battery Charger for charging the starting batteries;j) Emergency stop push button; andk) Silenced enclosure with an inline industrial 9db exhaust silencer. Factory inspection and testing prior to shipment of GENSET and Automatic Changeover Panel to be conducted in the presence of at least two representatives from the Client who shall endorse the test certificate upon satisfaction of equipment performance.The Contractor shall provide for liaison necessary in the testing of the GENSET and carter for all requisites to the optimum performance of the equipment prior to handover to the Client. Testing on load shall only be conducted upon receipt of approval from the Engineer; delays should be envisaged as shutdowns shall be subject to open window for Airport Operations and Traffic Schedule.Commissioning shall constitute running the GENSET on load for a minimum of 24hours. The Contractor shall thereafter be required to ensure good working order of the GENSET ready to take up load in advent of power failure. Upon satisfactory performance, signing of the Commissioning Certificate shall be done. The quoted amount under Bill Item B should include all costs for the Testing and Commissioning as per above specification.